Step 1
Positioning (Avoiding pipes) Drill approximately 4.5cm holes using a 6mm drill bit at four designated points, and insert yellow expansion plugs.
Step 2
Insert brass screws through the holes in the copper base, placing them into the expansion plugs, and tighten them using a Phillips screwdriver.
Thread the copper rod through the copper base and tighten the copper screws one by one (make sure the washer inside the copper base aligns with the screw position).
Place the assembled components into the prepared holes. Installation is complete.